Project Overview
Customer: Sherry Rhodes
Project: Structural · Foundation Support
Address: TEST 22 Canal Drive, Poquoson, VA 23662
Piers: 7 concrete piers with footings
Beam: 23 linear ft, (3) 2x8 pressure treated
Estimate #: 1199
Included Scope
10103Concrete Piers with FootingsIncluded
- Install 7 concrete footings, base 20 in. wide x 24 in. deep x 20 in. length
- Base filled with 12 in. of #57 gravel stone, then 12 in. of 5000 PSI concrete
- Metal power post adjustable jacks or concrete piers to support the beam
10105Main Beam InstallIncluded
- Install 23 linear ft of main beam built from (3) 2x8 pressure-treated lumber
- Beam lifted and secured on the new supports (10% lift maximum)
10121Electrical Outlet — Sump PumpIncluded
- New GFCI-protected outlet for the sump pump — outlet, box, wiring and connections
- GFCI tested for proper operation; sump pump verified operating safely from the new outlet
Site Photos (before work)
Itemized Scope — Crew & Allowance
| Crew / Service | Quantity | Amount | Days |
|---|---|---|---|
Concrete Piers with Footings | 7 | ||
Main Beam — (3) 2x8 Pressure Treated | 23 lr ft | ||
Electrical Outlet — GFCI for Sump Pump | 1 | ||
| 10% Customer discount | -$936.34 | ||
| GRAND TOTAL | $8,427.08 |
Payment Schedule
Deposit to Schedule
$4,213.54
Upon signing
Final Payment
$4,213.54
Upon completion
Total Project Cost: $8,427.08 · 10% customer discount (−$936.34) already applied · Check is a preferred method · Pay by credit card: (Virtual Affirm credit card not eligible)
Terms & Conditions
Notes: Jobsite will be left clean once completed. Contractor is not responsible for damage caused inside the home while repairing the foundation. Only 10 percent lift will be attempted when lifting and securing beams.
Warranty: 2 year lift · stabilization guaranteed · 12 months workmanship.
Payment: Deposit $4,213.54 · upon completion of project $4,213.54.
Validity: source estimate (Estimate #1199, dated 08/16/2026) expired September 15, 2026.